{"id":504,"date":"2025-01-30T23:03:00","date_gmt":"2025-01-30T14:03:00","guid":{"rendered":"https:\/\/mkpl.co.jp\/en\/?p=504"},"modified":"2025-10-21T22:47:58","modified_gmt":"2025-10-21T13:47:58","slug":"n20250129","status":"publish","type":"post","link":"https:\/\/mkpl.co.jp\/en\/n20250129\/","title":{"rendered":"Orders for 2.5 GWh of Vanadium Solid-State Batteries Received from the Austrian Government"},"content":{"rendered":"\n<p>On January 29, 2025, an event was held in Vienna, Austria, to confirm the stable operation of our 500 Wh battery module.<\/p>\n\n\n\n<p>Following the event, our Austrian subsidiary \u2014 <strong>Ewig Macht Plus GmbH (EMPlus)<\/strong> \u2014 received an <strong>official order for 2.5 GWh of energy-storage batteries<\/strong> (initial unit price: <strong>\u20ac1,500 per kWh<\/strong>) from the <strong>Austrian state government of Burgenland<\/strong>.<\/p>\n\n\n\n<p>This project will be promoted with appropriate support from both the <strong>Austrian federal government and the European Union<\/strong>.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\">Project Overview<\/h3>\n\n\n\n<p>The project will proceed through the following five phases.<\/p>\n\n\n\n<ol class=\"epb-timeline\">\n<li class=\"epb-timeline__item is-style-epb-border-dotted is-style-epb-number\" style=\"--epb-border-color:#eeeff0\"><div class=\"epb-timeline__number\" style=\"background-color:#828990;color:#ffffff\" data-fontweight=\"normal\"><\/div><div class=\"epb-timeline__headline\" style=\"color:#333333\" data-fontweight=\"normal\"><strong><strong>Verification of 1 kWh module<\/strong> (until end of June 2025) \u2014 <em>Completed<\/em><\/strong><\/div><div class=\"epb-timeline__body\">\n<p><\/p>\n<\/div><\/li>\n\n\n\n<li class=\"epb-timeline__item is-style-epb-border-dotted is-style-epb-number\" style=\"--epb-border-color:#eeeff0\"><div class=\"epb-timeline__number\" style=\"background-color:#828990;color:#ffffff\" data-fontweight=\"normal\"><\/div><div class=\"epb-timeline__headline\" style=\"color:#333333\" data-fontweight=\"normal\"><strong><strong><strong>Verification of 10 kWh module<\/strong> (by end of September 2025)<\/strong><\/strong><\/div><div class=\"epb-timeline__body\"><\/div><\/li>\n\n\n\n<li class=\"epb-timeline__item is-style-epb-border-dotted is-style-epb-number\" style=\"--epb-border-color:#eeeff0\"><div class=\"epb-timeline__number\" style=\"background-color:#828990;color:#ffffff\" data-fontweight=\"normal\"><\/div><div class=\"epb-timeline__headline\" style=\"color:#333333\" data-fontweight=\"normal\"><strong><strong><strong>After completion of the second phase, the <strong>EU will issue a \u201cCertificate of Availability\u201d<\/strong> and place a formal order for 2.5 GWh.<\/strong><\/strong><\/strong><\/div><div class=\"epb-timeline__body\">\n<p><\/p>\n<\/div><\/li>\n\n\n\n<li class=\"epb-timeline__item is-style-epb-border-dotted is-style-epb-number\" style=\"--epb-border-color:#eeeff0\"><div class=\"epb-timeline__number\" style=\"background-color:#828990;color:#ffffff\" data-fontweight=\"normal\"><\/div><div class=\"epb-timeline__headline\" style=\"color:#333333\" data-fontweight=\"normal\"><strong><strong><strong><strong><strong>Commercialization and performance characterization<\/strong> (by end of March 2026)<\/strong><\/strong><\/strong><\/strong><\/div><div class=\"epb-timeline__body\"><\/div><\/li>\n\n\n\n<li class=\"epb-timeline__item is-style-epb-border-dotted is-style-epb-number\" style=\"--epb-border-color:#eeeff0\"><div class=\"epb-timeline__number\" style=\"background-color:#828990;color:#ffffff\" data-fontweight=\"normal\"><\/div><div class=\"epb-timeline__headline\" style=\"color:#333333\" data-fontweight=\"normal\"><strong><strong><strong><strong><strong><strong>Start of deliveries<\/strong> \u2014 All deliveries scheduled to be completed between <strong>April 2026 and 2030<\/strong>.<\/strong><\/strong><\/strong><\/strong><\/strong><\/div><div class=\"epb-timeline__body\"><\/div><\/li>\n<\/ol>\n\n\n\n<p>Currently, <strong>small-lot production using pilot-scale mass-production equipment<\/strong> is underway at <strong>Sendai Laboratory No. 2<\/strong> to prepare for the second phase.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\">Expected Impact<\/h3>\n\n\n\n<p>In the EU, there is growing skepticism toward the construction of large-scale energy-storage facilities based on conventional lithium-ion rechargeable batteries, due to the risk of accidents such as fires.<br>As a result, expectations are rising for <strong>non-lithium-ion battery technologies<\/strong>, including <strong>lithium all-solid-state batteries<\/strong> and <strong>sodium-ion batteries<\/strong>.<\/p>\n\n\n\n<p>At present, <strong>no other emerging battery technology has succeeded in developing a kWh-class module<\/strong>, and both <strong>MKPLUS and EMPlus<\/strong> have received numerous inquiries, particularly from renewable-energy companies across Europe.<\/p>\n\n\n\n<p>When this project reaches its <strong>third phase<\/strong>, it is expected to lead to <strong>additional large-scale orders<\/strong> and further industrial collaboration within the EU.<\/p>\n\n\n\n<div class=\"epb-spacer\" style=\"--epb-space-height-sp:50px;--epb-space-height-tablet:50px;--epb-space-height-pc:80px;--epb-space-width-sp:100%;--epb-space-width-tablet:100%;--epb-space-width-pc:100%;--epb-space-margin-sp:-0px;--epb-space-margin-tablet:-0px;--epb-space-margin-pc:-0px\"><\/div>\n\n\n\n<div class=\"epb-advanced-buttons is-content-justification-center is-layout-flex wp-container-emanon-premium-blocks-advanced-button-is-layout-a89b3969 wp-block-emanon-premium-blocks-advanced-button-is-layout-flex\">\n<div class=\"epb-advanced-button-wrapper epb-has-button-text-align-center is-style-epb-microcopy-top-none is-style-epb-microcopy-bottom-none is-style-epb-position-icon-center is-style-epb-icon-none is-style-epb-button-hover-animation-falldown is-style-epb-icon-hover-animation-none is-style-button-shadow\" style=\"--epb-button-width-sp:100%;--epb-button-width-tablet:25%;--epb-button-width-pc:25%;--epb-button-radius:100px;--epb-button-padding-top:0.6em;--epb-button-padding-right:1.8em;--epb-button-padding-bottom:0.6em;--epb-button-padding-left:1.8em;--epb-button-border-style:solid;--epb-button-border-width-top:2px;--epb-button-border-width-bottom:2px;--epb-button-border-width-left:2px;--epb-button-border-width-right:2px;--epb-button-text-font-size-sp:16px;--epb-button-text-font-size-tablet:16px;--epb-button-text-font-size-pc:16px;--epb-button-text-letter-spacing:0em;--epb-button-text-line-height:1;--epb-button-text-font-weight:normal;--epb-microcopy-top-font-size-sp:12px;--epb-microcopy-top-font-size-tablet:12px;--epb-microcopy-top-font-size-pc:12px;--epb-microcopy-top-letter-spacing:0.1em;--epb-microcopy-top-font-weight:normal;--epb-microcopy-bottom-font-size-sp:12px;--epb-microcopy-bottom-font-size-tablet:12px;--epb-microcopy-bottom-font-size-pc:12px;--epb-microcopy-bottom-letter-spacing:0.1em;--epb-microcopy-bottom-font-weight:normal;--epb-button-border-color:#333333;--epb-button-text-color:#333333;--epb-button-icon-color:#333333;--epb-button-icon-style-color:#e5e7e8;--epb-microcopy-top-color:#333333;--epb-microcopy-top-style-color:#e5e7e8;--epb-microcopy-bottom-color:#333333;--epb-microcopy-bottom-style-color:#e5e7e8;--epb-microcopy-bottom-style-background-color:#ffffff\"><a class=\"epb-advanced-button\" href=\"\/en\/contact\"><span class=\"epb-advanced-button__text\">Contact us<\/span><\/a><\/div>\n<\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On January 29, 2025, an event was held in Vienna, Austria, to confirm the stable operation of our 500 Wh batte [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-504","post","type-post","status-publish","format-standard","hentry","category-notices"],"_links":{"self":[{"href":"https:\/\/mkpl.co.jp\/en\/wp-json\/wp\/v2\/posts\/504","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mkpl.co.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mkpl.co.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mkpl.co.jp\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mkpl.co.jp\/en\/wp-json\/wp\/v2\/comments?post=504"}],"version-history":[{"count":6,"href":"https:\/\/mkpl.co.jp\/en\/wp-json\/wp\/v2\/posts\/504\/revisions"}],"predecessor-version":[{"id":552,"href":"https:\/\/mkpl.co.jp\/en\/wp-json\/wp\/v2\/posts\/504\/revisions\/552"}],"wp:attachment":[{"href":"https:\/\/mkpl.co.jp\/en\/wp-json\/wp\/v2\/media?parent=504"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mkpl.co.jp\/en\/wp-json\/wp\/v2\/categories?post=504"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mkpl.co.jp\/en\/wp-json\/wp\/v2\/tags?post=504"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}